1. Data Center Migrations – It’s in the Plan (Part 2)

    Data Center Knowledge (Aug 24 2011)

    1. Data Center Migrations – It’s in the Plan (Part 2) This column on data center migrations, second in a two-part series, explains the difference between “LAN away” and “WAN away” and the benefits and challenges in using V-2-V (virtual to virtual) copies. A “LAN away” is Significantly Different Than a “WAN away” – Even if it’s Just Temporary The impact of high-speed LAN connectivity versus lower-speed WAN connectivity [both latency and bandwidth] between both interdependent applications as well as user connectivity to those applications cannot be under-stated. Far too many home-grown applications have always assumed that the applications talking together live are: 1) in the same data center and 2) the end-users are probably on a different floor in the same building or campus. This introduces many additional challenges to a migration project taking place over several weeks and/or months with things moving in stages. How long can any type of performance hit be tolerated? While new agile application ... (Read Full Article)

      Bookmark or Share this article

    Login to comment.